シンガポールの水管理

Singapore Water Management

表示:

This example was produced as a SE example directly for the SEBoK. It describes a systems engineering approach in the development of a sustainable National Water Management System for the Republic of Singapore. It demonstrates the successful outcome of long-term planning and a systems approach to preempt a critical water shortage. The example is primarily based on information taken from a paper presented at the INCOSE International Symposium in 2008. (Chia 2008.)

この事例は、SEBoKのために直接作成されたSEの事例である。シンガポール共和国における持続可能な国家水管理システムの開発に用いられたシステムズエンジニアリングのアプローチについて述べる。重大な水不足を未然に防ぐための長期計画とシステムズアプローチの成功した成果を示す。この事例は、主に2008年の国際システムズエンジニアリング協議会(INCOSE)国際シンポジウムで発表された論文の情報に基づいている(Chia 2008)。

Description

説明

When Singapore achieved independence in 1965, water supply depended on water catchment in local reservoirs and two bilateral water agreements with its closest neighbor, Malaysia. These water agreements are registered with the United Nations. The first agreement expired in August 2011, and the second agreement will expire in 2061 (Singapore 2012). After several failed attempts to renegotiate the extension of the first water agreement, Singapore determined that it was necessary to achieve full water self-sufficiency by 2060 in case the second water agreement also could not be extended. An intermediate goal was to match the supply of the first water agreement before it expired. This was achieved in several ways. In 2001, the Public Utilities Board (PUB), the national water agency responsible for treating raw water in Singapore, was charged to also begin managing wastewater and stormwater, allowing for an integrated and holistic approach to water management.

シンガポールが1965年に独立したとき、水の供給は、地元の貯水池での集水と、最も近い隣国マレーシアとの2つの二国間水協定に依存していた。これらの水協定は国際連合に登録されている。最初の協定は2011年8月に失効し、2番目の協定は2061年に失効する(Singapore 2012)。最初の水協定の延長をめぐる再交渉が何度か不調に終わった後、シンガポールは、2番目の水協定も延長できない場合に備えて、2060年までに水の完全自給を達成する必要があると判断した。中間目標は、最初の水協定が失効する前に、同協定による供給量に見合う水量を確保することであった。これはいくつかの方法によって達成された。2001年、シンガポールで原水の処理を担う国家水機関である公共事業庁(Public Utilities Board, PUB)は、廃水と雨水流出水の管理もあわせて開始するよう命じられ、これにより水管理への統合的かつ全体的なアプローチが可能になった。

This example examines Singapore’s water management system from a large-scale systems engineering perspective, particularly focusing on the goals, boundaries (see Concepts of Systems Thinking), stakeholders (see Stakeholder Needs Definition), and complexities involved in this type of a national system. This approach illustrates how Systems Thinking (illustrated through causal loop diagrams) and other systems engineering tools may be used to understand systems complexities. Concepts and methodologies of learning organizations were applied to enable understanding of behavioral complexities. Lean thinking facilitated a long-term strategic philosophy, built on the premise of continuous improvements.

この事例は、シンガポールの水管理システムを大規模システムズエンジニアリングの観点から検討し、特に、この種の国家システムに関わる目標、境界(システム思考の概念を参照)、ステークホルダー(ステークホルダーニーズ定義を参照)、複雑さに焦点を当てる。このアプローチは、システム思考(因果ループ図によって示される)やその他のシステムズエンジニアリングツールを、システムの複雑さの理解にどのように活用できるかを示している。行動の複雑さを理解できるようにするため、学習する組織の概念と方法論が適用された。リーン思考は、継続的改善という前提の上に築かれた長期的な戦略哲学を促進した。

Perhaps more importantly, it shows that while systems engineering, especially the Systems Approach, is necessary for the conceptualization and planning of such a complex system, it is not sufficient for success. It is the systemic structures that have been put in place over decades, political will, leadership, people, and culture that make such tasks realizable.

おそらくより重要なのは、このような複雑システムの概念化と計画にはシステムズエンジニアリング、とりわけシステムズアプローチが必要である一方で、それだけでは成功に十分ではないことを示している点である。こうしたタスクを実現可能にしているのは、数十年をかけて整えられてきたシステム的構造、政治的意思、リーダーシップ、人々、そして文化である。

The supply of water in Singapore is managed in totality. Collecting rainwater, purchasing water, and purifying water utilizing reverse osmosis and desalination were all considered. Approaches included even incentivizing consumers to change their habits by making drains and canals recreational areas to encourage the public not to dispose of waste in their drains. By managing sewage and drainage together with water, environmental considerations are taken into account as well. By carefully adjusting organizational boundaries, Singapore has managed to reduce silo thinking and parochial interests. The relationships between the industry innovators, government, suppliers and users, and technology innovators create opportunities for Singapore’s water management. This demonstrates how multiple stakeholder interests can be combined to create a viable water management solution. Continuous improvements through the use of technology and elimination of waste, such as reducing water that is not accounted for in the system, help to assure the sustainability of an adequate supply of water for a growing Singapore population. The Singapore Water Management system is already in successful operation and is being studied by the Organization for Economic Co-operation and Development (OECD) and by other nations.

シンガポールの水の供給は全体として管理されている。雨水の収集、水の購入、逆浸透と淡水化による水の浄化が、いずれも検討された。そのアプローチには、排水溝や運河をレクリエーションエリアにすることで、一般の人々が排水溝に廃棄物を捨てないよう促し、消費者が習慣を変えるよう動機づけることさえ含まれていた。下水と排水を水と一体的に管理することで、環境への配慮もなされている。組織の境界を慎重に調整することで、シンガポールはサイロ思考と偏狭な利害を減らすことに成功した。産業界の革新者、政府、供給者と利用者、技術の革新者の間の関係が、シンガポールの水管理に機会を生み出している。これは、複数のステークホルダーの利害を組み合わせて、実行可能な水管理ソリューションを生み出す方法を示している。技術の活用や、システム上で計上されない水の削減といった無駄の排除を通じた継続的改善は、増加するシンガポールの人口のための十分な水供給の持続可能性を確保するのに役立っている。シンガポールの水管理システムは既に成功裏に運用されており、経済協力開発機構(OECD)や他の国々によって研究されている。

Summary

要約

The supply of water in Singapore is managed in totality through a systems approach, i.e., water catchment, supply, sewage and drainage. The importance of relationships between the stakeholders is also recognized. Industry innovators, political leadership, suppliers, and consumers are all involved; the project has been able to incentivize this diverse group to work together for a common goal, i.e., assuring the sustainability of an adequate supply of water for Singapore into the future.

シンガポールの水の供給は、システムズアプローチを通じて全体として、すなわち集水、供給、下水、排水にわたって管理されている。ステークホルダー間の関係の重要性も認識されている。産業界の革新者、政治の指導層、供給者、消費者がいずれも関与している。このプロジェクトは、この多様な集団が共通の目標、すなわち将来にわたってシンガポールの十分な水供給の持続可能性を確保するという目標に向けて協力するよう動機づけることができた。

Utilizing systems engineering and taking into consideration the systemic structures and culture required have helped Singapore achieve its first milestone of supplying its own water resources by 2010. Singapore has been able to overcome the shortfall that would have come about with the expiry of the first water agreement with Malaysia in 2011.

システムズエンジニアリングの活用と、必要とされるシステム的構造および文化への配慮は、シンガポールが2010年までに自国の水資源による供給を実現するという最初のマイルストーンを達成する助けとなった。シンガポールは、2011年のマレーシアとの最初の水協定の失効に伴って生じたであろう不足を克服できた。

References

参考文献

Works Cited

引用文献

Chia, A. 2008. "A large-scale systems engineering perspective of water management in Singapore." Proceedings of the 18th Annual INCOSE International Symposium, 15-19 June 2008, Utrecht, The Netherlands.

Singapore Government. 2012. "The Singapore Water Story." Available at https://www.pub.gov.sg/water/Pages/singaporewaterstory.aspx. Accessed August 2012.

Primary References

主要参考文献

None.

Additional References

追加参考文献

Public Utilities Board. 2007. "PUB Main Website". Available at https://www.pub.gov.sg. Accessed August 2011.

Tortajada, C. 2006. "Water management in Singapore." International Journal of Water Resources Development. vol. 22, no. 2 p. 227-240.